OUR MAJOR CLIENTS
  • Oman Electricity Transmission Company
  • Rural Areas Electricity Company
  • Dhofar Power Company
  • Majan Electricity Company
  • Mazoon Electricity Company
  • Muscat Electricity Distribution Company
  • Al Adrak Trading & Contracting LLC
  • WJ Towell Group
  • Gulf Petroleum Services
  • Royal Court Affairs
  • Alisco Strong Plant Trad. & Cont. L.L.C
  • Carillion Alawi LLC
  • Khalid bin Ahemed & Sons LLC
HIGH VOLTAGE DIVISION

A Legacy of Excellence

This division has been at the forefront of the Electrical utility system in Oman and has the rare privilege of being awarded “Best Electrical Contractor-Performance” by the Government Licensing Authority (DCRP). The division had humble beginnings in 2001 with a team of 5 members and has witnessed consistent growth ever since. Currently, we have a team of 37 Engineers, 300 technicians and operate 9 branches over Oman.  We primarily cater to Government Electrical Utilities and carry out EPC contracts in the electrical transmission and distribution field.

ASM LLC is a certified A Grade Electrical Contractor and has a separate Protection, Testing & Commissioning team with precision testing equipment and the know how to operate in this niche domain.

A separate electrical team has been formed to handle electrical projects in the private domain. This team handles electrical installation, testing & commissioning for civil, road, infrastructure contractors and other private clients.

Our experience in handling challenging projects & capability to operate in any part of the country has gained us the trust of our valued clients.

Major Capabilities

  • Design, Erection & commissioning of 33/11.5 kV outdoor and indoor primary substations.
  • Design, Erection & Commissioning of various types of distribution substation like pole mounted, ground mounted and package substations.
  • Design, Erection & Commissioning of MV panels, Auto Reclosers, RMU, OLU, Feeder pillars, Cutout boxes, Meter panel, and more.
  • Design, Erection and commissioning of battery and DC systems for substations.
  • Erection of power and distribution transformers.
  • Upgrading of primary substations & capacity enhancement of transformers. 
  • Erection of GIS and AIS switch gears, control and relay panels, Reactors, Capacitor banks, Instrument transformer and Power Quality meters to name a few.
  • Erection of Bus Ducts.
  • Transformer oil filtration and BDV testing.
  • Installation of earthing and lightning protection system.
  • Cable laying upto 33kV with modern equipment.
  • Construction of OH Line up to 132kV on steel tower/concrete pole/wooden pole.
  • Maintenance projects for substations, transformers and switch gears. 
  • Industrial electrification and maintenance projects.
  • Implementation of SCADA and communication systems for substations.
  • Fibre Optic Cabling and associated network jobs.
  • Service of licensed and approved cable Jointers.
  • Streetlight works.
  • Preparation of BOQ and budgeting for tendering works.
  • Preparation of cable schedule, control cable laying and termination.
  • Protection study and relay setting coordination.

Testing Capabilities

  • Testing of main and backup protection relays for transformers, feeder lines, busbar, etc.
  • Testing of capacitor bank and shunt reactors.
  • Testing of Switchgears (Conventional and GIS type), 33kV and 11kV Auto Reclosures and RMU.
  • Testing of control and protection panels of all voltage levels.
  • Testing of power, distribution and Instrument transformers.
  • Testing of power cables upto 33kV.
  • Testing of AC/DC UPS systems, battery charges and Industrial Batteries.
S.noTitleClientDescription
1EPC OF 33KV NETWORK AND SUBSTATIONS FOR MASIRAH ISLAND IN SHARQIA GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTION OF 11/33KV STEP UP SUBSTATION INSTALLATION OF 3×31.5MVA 11/33KV TRANSFROMERS & INSTALLATION OF 2×10 MVA 11/33 KV TRANSFORMER LAYING OF 61.6KM 3Cx300MM² + 24F FOC CABLE
2INTERCONNECTION OF 33KV BUSBARS IN BOUSHER & MAWALEH GRID STATIONSOMAN ELECTRICITY COMPANY SAOCINSTALLATION OF 33KV SWITCHGEAR INSTALLATION OF CONTROL & RELAY PANELS SCADA WORKS GRID STATION MODIFICATION WORKS
3CONSTRUCTION OF 33KV & 11KV FEEDERS FROM AL MINTRIB PRIMARY S/S AND CONSTRUCT AL SHARIQ PRIMARY S/S 1X6 MVA, (33/11KV) WITH 33KV & 11KV FEEDERS IN BEDYAH AT NORTH AL SHARQEYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCLAYING OF 33KV CABLES CONSTRUCTION OF 33KV OVERHEAD LINE FEEDERS IN CONCRETE POLES LAYINF OF 11KV CABLES CONSTRUCTION OF TEMPORARY PRIMARY SUBSTATIONS
4UPGRADING OF EXISTING SITE-5 PRIMARY SUBSTATION FROM 2X6 MVA TO 2X20 MVA AT SOHAR INDUSTRIAL ESTATEMAJAN ELECTRICITY COMPANY SAOCCONSTRUCTION OF 2X20 MVA PRIMARY SUBSTATION & ASSOCIATED WORKS
5CONSTRUCTION OF INFRASTRUCTURE FOR NEW LIWA RESIDENTIAL AREAMINISTRY OF HOUSINGLAYING OF 3CX240 mm² CABLE – 110KM LAYING OF 4CX300 mm² CABLE – 286KM LAYING OF 4CX50 mm² CABLE – 190KM INSTALLATION OF 1000KVA PACKAGE SUBSTTAION – 157 NOS INSTALLATION OF 500KVA PACKAGE SUBSTTAION – 15 NOS INSTALLATION OF POLE MOUNTED TRANSFORMER- 68 NOS
6CONSTRUCTION OF 33 KV FEEDER (UNDER GROUND CABLE) FROM AL NAHDAH 33/11 KV PRIMARY SUBSTATION TO THE PROPOSED DAWAH PRIMARY SUBSTATION WILAYAT MASIRAH- AL SHARQIYAH GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTION OF 33/11KV PRIMARY SUBSTATION INSTALLATION OF 2x3MVA 33/11KV TRANSFROMERS LAYING OF 18KM 3Cx300MM² + 24F FOC CABLE
7CONSTRUCTION OF TWO NEW INCOMER 33KV FEEDERS AND SEVEN 11 KV OUTGOING FEEDERS FROM DIYAN AND AL KADHRA PRIMARY SUBSTATIONS AT SUWAIQ IN NORTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCLAYING OF 33 & 11 KV CABLES: 31 KM WADI CONCRETE, ASPHALT ROAD WORKS, OVERHEAD LINE WORKS
8CONSTRUCTION OF 11 KV FEEDER (UNDER GROUND CABLE) FROM THE PROPOSED 33/11 KV IN SHEGAF PRIMARY SUBSTATION TO THE NEW HOSPITAL IN WILAYAT MASIRAH- AL SHARQIYAH SOUTH GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCLAYING OF 11 KM 3CX 240 mm² CABLE
9CONSTRUCTION OF 33 KV FEEDERS FROM KHADRA GRID STATION TO KHADRA PRIMARY SUBSTATION AT SUWAIQ IN SOUTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCLAYING OF 19.4 KM 3CX 300 mm² UNDERGROUND CABLE INSTALLATION OF CONCRETE POLES & STRINGING OF PANTHER CONDUCTOR
10CONSTRUCTION OF 2x6MVA AL FAYHA PRIMARY SUBSTATION (33/11KV) WITH 33KV INCOMERS & 11KV OUTGOING FEEDERS AT SUMAIL IN DAKHLIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF 33/11KV PRIMARY SUBSTATION INSTALLATION OF 2x6MVA 33/11KV TRANSFROMERS 33KV OVERHEAD & UNDERGAROUND CABLE WORKS SCADA WORKS
11LOAD SHIFTING TO MOBELLAH GRID STATION-BMUSCAT ELECTRICITY DISTRIBUTION COMPANY SAOCLAYING OF 18.8 KM 3CX 300 mm² UNDERGROUND CABLE LAYING OF 18.8 KM FIBER OPTIC CABLE INSTALLATION, TESTING & COMMISSIONING OF 33KV RMU & DIFFERENTIAL CONTROL RELAY
12EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL KHOUDH, PH-7, SEEB AREAMUSCAT ELECTRICITY DISTRIBUTION COMPANY SAOCCONSTRUCTION OF GRP DISTRIBUTION SUBSTATIONS UNDERGROUND CABLE LAYING
13INSTALLATION OF 6 MVA TRANSFORMER AND EXTENSION OF STEEL GANTRY AT WILAYAT BIDBID IN DAKHILIYAH GOVERNORATE FOR 2013MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF STEEL GANTRY INSTALLATION OF 6MVA TRANSFORMER
14REINFORCEMENT WORKS OF 11 KV & LV NETWORKS AT AL BILH & AL-OQDHA AT BARKA IN SOUTH BATINAH GOVERNORATE FOR 2014MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
15EXTENSION OF POWER SUPPLY TO THE BATINAH HOUSING UNITS IN BATINAH COASTAL ROAD AT BADA’A AL SHARQEYA, HARA AL QADIMA & BATHA ALSHIL AT SUWAIQ IN NORTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION UNDERGROUND CABLE LAYING
16CONVERSION OF ALL OH AND DANGEROUS SERVICES CONNECTIONS AND ITS ASSOCIATED LV LINE AS PER SAFETY REQUIREMENTS AT AL KHUWAIMA VILLAGE IN WILAYAT JALAN BANI BU ALI SHARQIYAH SOUTH GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTION OF UNDERGROUND CABLE DISMANTLING OF EXISTING FEEDERS
17POWER SUPPLY TO STREET LIGHTS AT NEW DUQUM TOWN, FROM DUQUM TOWN – 02 S/S AT DUQUM WILAYAT – AL WUSTA GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTION OF PACKAGE SUBSTATION UNDERGROUND CABLE LAYING
18REINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT RUSTAQ IN SOUTH BATINAH GOVERNORATE FOR THE YEAR 2013MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
19INSTALLATION OF 6MVA TRANSFORMERS AT SAYMA IN IZKI AREAMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS WOODEN POLE GANTRY WORKS
20INSTALLATION OF 6MVA TRANSFORMERS AT ZUKAIT IN IZKI AREAMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS WOODEN POLE GANTRY WORKS
21INSTALLATION OF 6MVA TRANSFORMERS AT MAHIOOL AT MANAH AREAMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS WOODEN POLE GANTRY WORKS
22INSTALLATION OF 6MVA TRANSFORMERS AT BUSHAIR SUBSTATION IN DAKLIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS WOODEN POLE GANTRY WORKS
23CONSTRUCTION OF NEW 33/11KV (2×6 MVA) PRIMARY SUBSTATIONMAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF PRIMARY SUBSTATION INSTALLATION OF 6MVA TRANSFORMERS
24INSTALLATION OF TEMPORARY 2x6MVA TRANSFORMER IN JALAN BANI BU HASSAN AT SHARQIYAH SOUTH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS
25INSTALLATION OF TEMPORARY 1x6MVA TRANSFORMER IN JALAN BANI BU ALI AT SHARQIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS
26REPLACEMENT OF EXISTING 3MVAR CAPACITOR BANK TO 5MVAR IN IBRI & DANK MAJAN ELECTRICITY COMPANY SAOCDISMANTLING OF 3MVAR CAPACITOR BANKS INSTALLATION OF 5MVAR CAPACITOR BANKS
27ELECTRICAL INSTALLATION WORKS OF DISTRIBUTION SYSTEM BY UNIT RATE AT AL DAKHALIYAH REGIONMAZOON ELECTRICITY COMPANY SAOCOVERHEAD LINE WORKS
28ELECTRICAL RE-INFORCEMENT WORKS AT SAMAIL AND BID BID IN DAKHILIYA REGION FOR 2011MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS
29EXTENSION OF POWER SUPPLY TO SCATTER FARMS AT SOUTH BATINAH REGIONMAZOON ELECTRICITY COMPANY SAOCOVERHEAD LINE WORKS
30EXTENSION OF POWER SUPPLY TO SCATTERED PREMISES AT NIZWA & MANAH IN DAKHALIYAH REGIONMAZOON ELECTRICITY COMPANY SAOCOVERHEAD LINE WORKS
31REINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT MUDHAIBI IN NORTH SHARQIYAH GOVERNORATE FOR THE YEAR 2013MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS
32REINFORCEMENT WORKS IN EXISTING HV & LV ELECTRICAL DISTRIBUTION NETWORK AT WILAYAT HAIMA IN AL WUSTA GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
33REINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT SUR IN SOUTH SHARQIYAH GOVERNORATE FOR THE YEAR 2013MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
34REINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT JAALAN B.B.ALI AT SOUTH SHARQIYAH GOVERNORATE FOR THE YEAR 2013MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
35SHIFTING OF HIGH AND LOW VOLTAGE ELECTRICAL NETWORKS WHICH EFFECTING PROPERTIES IN BARKA AT SOUTH BATINAH GOVERNORATE FOR THE YEAR 2013MAZOON ELECTRICITY COMPANY SAOCOVERHEAD LINE WORKS UNDERGROUND CABLE LAYING DISMANTLING OF EXISTING OVERHEAD LINES
36REINFORCEMENT WORKS OF 11 KV & LV NETWORKS AT RUSTAQ IN SOUTH BATINAH GOVERNORATE FOR 2014MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
37REINFORCEMENT WORKS OF 11 KV & LV NETWORKS AT SUR IN SOUTH SHARQIYAH GOVERNORATE FOR 2014MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
38ELECTRICAL DISTRIBUTION WORKS ( 433 V & 11 KV NETWORKS EXTENSION ) FOR POWER SUPPLY TO THE SCATTERED PREMISES IN WILAYAT NIZWA DAKHLIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCOVERHEAD LINE WORKS UNDERGROUND CABLING WORKS CONSTRUCTION OF DISTRIBUTION SUBSTATIONS
39DIVERSION OF 11 KV O/H LINES IN TO U/G CABLES AT FANJA AT BIDBID IN DAKHILIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCDISMANTLING OF EXISTING OVERHEAD LINES UNDERGROUND CABLING WORKS
40REINFORCEMENT WORKS OF 11 KV & LV NETWORKS AT J.B.B.ALI IN SOUTH SHARQIYAH GOVERNORATE FOR 2014MAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF DISTRIBUTION SUBSTATION OVERHEAD LINE WORKS UNDERGROUND CABLE LAYING
41CONSTRUCTION OF 33 KV FEEDERS FROM KHADRA GRID STATION TO KHADRA PRIMARY SUBSTATION AT SUWAIQ IN SOUTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCUNDERGROUNG CABLING WORKS OVERHEAD LINE & CONCRETE POLE ERECTION
42PROP 33KV LINE TO LINK RAS AL HAD AIRPORT FEEDER FROM WADI SAAL PRI. S/S AT WADI SAAL IN BBAMAZOON ELECTRICITY COMPANY SAOC33KV OVERHEAD LINE WORKS
43CABLING WORKS TO FEED NEW ROP COMPLEX FROM 33/11 KV DUQM SOUTH SUBSTATION- AL WUSTA GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTIOON OF RMU SUBSTATION UNDERGROUND CABLE LAYING
44UPGRADE KAHANAT PRIMARY SS FROM 2X 3MVA TO 2X 6MVA AND ASSOCIATED ELECTRICAL WORKS AT DHAHIRAH GOVERNORATEMAJAN ELECTRICITY COMPANY SAOCDISMANTLING OF EXISTING 3MVA & INSTALLATION OF NEW 6MVA TRANSFOMERS INSTALLATION OF AUTO RECLOSERS
45433V & 11 KV NETWORKS REINFORCEMENT -2015 AT WILAYAT KHABURAH (PHASE -2) NORTH BATINAH GOVERNORATEMAJAN ELECTRICITY COMPANY SAOCOVERHEAD & UNDERGROUND CABLE WORKS
46PROPOSED TEMPORARY 6MVA TRANSFORMER FOR LOAD SHARING FROM AL FELAJ PRIMARY AT SUR IN SHARQIYAH SOUTH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS
47PROPOSED TEMPORARY 6MVA TRANSFORMER FOR LOAD SHARING FROM FEEDER 7 IN BBH AT SHARQIYAH SOUTH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCINSTALLATION OF 6MVA TRANSFORMERS
48INSTALLATION OF NEW 11KV FEEDERS & INTERLINKS FROM SUR AL BALOOSH & ASWAD PRIMARY S.S AT SHINAS AREAMAJAN ELECTRICITY COMPANY SAOCINSTALLATION OF NEW 11KV FEEDERS & INTERLINKS FROM SUR AL BALOOSH & ASWAD PRIMARY S.S AT SHINAS AREA IN NORTH BATINAH GOVERNORATE.
49REPLACEMENT OF (11KV ) OLD & LEAKAGE RMU WITH NEW RMUMAJAN ELECTRICITY COMPANY SAOCREPLACEMENT OF (11KV )OLD & LEAKAGE RMU BY NEW RMU AT NORTH BATINAH GOVERNORATE.
50CONSTRUCTION OF 33 KV FEEDERS FROM KHADRA GRID STATION TO KHADRA PRIMARY SUBSTATION AT SUWAIQMAZOON ELECTRICITY COMPANY SAOCCONSTRUCTION OF 33 KV FEEDERS FROM KHADRA GRID STATION TO KHADRA PRIMARY SUBSTATION AT SUWAIQ IN SOUTH BATINAH GOVERNORATE.
51NETWORKS REINFORCEMENT -2015 AT WILAYAT KHABURAH (PHASE -2) MAJAN ELECTRICITY COMPANY SAOC433V & 11 KV NETWORKS REINFORCEMENT -2015 AT WILAYAT KHABURAH (PHASE -2) NORTH BATINAH GOVERNORATE
52EXTENSION OF POWER SUPPLY TO FEED A PLOT AT SEDAN AL KHABOURAHMAJAN ELECTRICITY COMPANY SAOCEXTENSION OF POWER SUPPLY TO FEED A PLOT AT SEDAN AL KHABOURAH, NORTH BATINAH GOVERNORATE.
53SUPPLY AND REPLACEMENT OF 33KV ABS IN IBRI (HOSPITAL) PS, KUBARAH 33KV FEEDER AND AL WAQBAMAJAN ELECTRICITY COMPANY SAOCSUPPLY AND REPLACEMENT OF 33KV ABS TYPE MLE SILICON RUBBER HORIZONTAL (7 NO’s) IN IBRI (HOSPITAL) PS, KUBARAH 33KV FEEDER AND AL WAQBA
54CONSTRUCTION OF 11 KV SHUNT REACTORS FOR DUQM POWER SYSTEMRURAL AREAS ELECTRICITY COMPANY SAOCSUPPLY, INSTALL, TEST & COMMISSION OF 11 KV SHUNT REACTORS FOR DUQM POWER SYSTEM- AL-WUSTA GOVERNORATE
55CONVERSION OF 11 KV AND LT OVERHEAD LINE TO UNDER GROUND CABLE AT OTEB, SOHAR AREAMAJAN ELECTRICITY COMPANY SAOCCONVERSION OF 11 KV AND LT OVERHEAD LINE TO UNDER GROUND CABLE AT OTEB, SOHAR AREA IN NORTH BATINAH GOVERNORATE
56CONSTRUCTION OF 11 KV FEEDER (UNDER GROUND CABLE) FROM THE PROPOSED 33/11 KV IN SHEGAF PRIMARY SUBSTATION TO THE NEW HOSPITAL IN WILAYAT MASIRAHRURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTION OF 11 KV FEEDER (UNDER GROUND CABLE) FROM THE PROPOSED 33/11 KV IN SHEGAF PRIMARY SUBSTATION TO THE NEW HOSPITAL IN WILAYAT MASIRAH- AL SHARQIYAH SOUTH GOVERNORATE
57UPGRADEING KAHNAT PRIMARY SS FROM 2X3MVA TO 2X6MVA IN IBRIMAJAN ELECTRICITY COMPANY SAOCUPGRADE KAHNAT PRIMARY SS FROM 2X3MVA TO 2X6MVA AND ASSOCIATED ELECTRICAL WORKS IN IBRI AT DHAHIRA GOVERNORATE
58REHABILITATION OF ASSET LIFE OF 11 KV OHL AT SAHAM & KHABURAH IN NORTH BATINAH GOVERNORATEMAJAN ELECTRICITY COMPANY SAOCREHABILITATION OF ASSET LIFE OF 11 KV OHL AT SAHAM & KHABURAH IN NORTH BATINAH GOVERNORATE
59REPLACEMENT OF EXISTING CAPACITOR BANK FROM 3MVAR TO 5MVAR AT IBRI AND DANK GRID AL DHAHIRAH GOVERNORATEMAJAN ELECTRICITY COMPANY SAOCREPLACEMENT OF EXISTING CAPACITOR BANK FROM 3MVAR TO 5MVAR AT IBRI AND DANK GRID AL DHAHIRAH GOVERNORATE
6011kV CABLING WORKS TO FEED NEW ROP COMPLEX FROM 33/11KV SOUTH SUB STATION AT DUQM RURAL AREAS ELECTRICITY COMPANY SAOC11kV CABLING WORKS TO FEED NEW ROP COMPLEX FROM 33/11KV SOUTH SUB STATION AT DUQM IN AL WUSTA GOVERNORATE
61CONSTRUCTION OF 33 KV FEEDER FROM AL NAHDAH 33/11 KV PRIMARY SUBSTATION TO THE PROPOSED DAWAH PRIMARY SUBSTATION WILAYAT MASIRAHRURAL AREAS ELECTRICITY COMPANY SAOCCONSTRUCTION OF 33 KV FEEDER (UNDER GROUND CABLE) FROM AL NAHDAH 33/11 KV PRIMARY SUBSTATION TO THE PROPOSED DAWAH PRIMARY SUBSTATION WILAYAT MASIRAH- AL SHARQIYAH GOVERNORATE
6211kV CABLING WORKS TO FEED NEW ROP COMPLEX FROM 33/11KV SOUTH SUB STATION AT DUQM RURAL AREAS ELECTRICITY COMPANY SAOC11kV CABLING WORKS TO FEED NEW ROP COMPLEX FROM 33/11KV SOUTH SUB STATION AT DUQM IN AL WUSTA GOVERNORATE
63BREAK DOWN MAINTENANCE AND ASSET SECURITY SERVICES AT NIZWA DISTRICT AT AL-DAKHILIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCBREAK DOWN MAINTENANCE AND ASSET SECURITY SERVICES AT NIZWA DISTRICT AT AL-DAKHILIYAH GOVERNORATE
64REHABILITATION WORKS OF 33 KV, 11 KV & LT NETWORKS AT RUSTAQMAZOON ELECTRICITY COMPANY SAOCREHABILITATION WORKS OF 33 KV, 11 KV & LT NETWORKS AT RUSTAQ IN SOUTH BATINAH GOVERNORATE
65REHABILITATION OF 11 KV & LT NETWORKS AT BARKAMAZOON ELECTRICITY COMPANY SAOCREHABILITATION OF 11 KV & LT NETWORKS AT BARKA IN SOUTH BATINAH GOVERNORATE
66REINFORCEMENT WORKS OF 11KV & LV NETWORKS AT J.B.B ALI IN SOUTH SHARQIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCREINFORCEMENT WORKS OF 11KV & LV NETWORKS AT J.B.B ALI IN SOUTH SHARQIYAH GOVERNORATE
67REINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT RUSTAQ IN SOUTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCREINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT RUSTAQ IN SOUTH BATINAH GOVERNORATE
68ELECTRICAL POWER SUPPLY TO VARIOUS LOCATIONS IN WILYAT NIZWAMAZOON ELECTRICITY COMPANY SAOCELECTRICAL POWER SUPPLY THE DIFFERENT LOCATIONS IN WILYAT NIZWA AT ALDHKHILIYAH GOVERNORATE
69REINFORCEMENT WORKS OF 11KV & LV NETWORKS AT SUR IN SOUTH SHARQIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCREINFORCEMENT WORKS OF 11KV & LV NETWORKS AT SUR IN SOUTH SHARQIYAH GOVERNORATE
70REINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT AL BILH & AL OQDAH AT BARKAMAZOON ELECTRICITY COMPANY SAOCREINFORCEMENT WORKS OF 11 KV & LT NETWORKS AT AL BILH & AL OQDAH AT BARKA IN SOUTH BATINAH GOVERNORATE
71REINFORCEMENT WORKS OF 11KV & LV NETWORKS AT ADAM IN DAKHILIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCREINFORCEMENT WORKS OF 11KV & LV NETWORKS AT ADAM IN DAKHILIYAH GOVERNORATE
72DIVERSION OF 11KV O/H LINES IN TO U/G CABLES AT FANJA AT BIDBID IN DAKHILIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCDIVERSION OF 11KV O/H LINES IN TO U/G CABLES AT FANJA AT BIDBID IN DAKHILIYAH GOVERNORATE
73433V & 11KV NETWORK REINFORCEMENT -2014-LOAD RELATED AT WILAYAT KHABOURAH (PHASE 1)NORTH AL BATINAH GOVERNORATE.MAJAN ELECTRICITY COMPANY SAOC433V & 11KV NETWORK REINFORCEMENT -2014-LOAD RELATED AT WILAYAT KHABOURAH (PHASE 1)NORTH AL BATINAH GOVERNORATE.
74EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL KHOUDH PHASE-7 AT ZONE3MUSCAT ELECTRICITY DISTRIBUTION COMPANYEXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL KHOUDH PHASE-7 AT ZONE3
75EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL MABELLAH SOUTH, 34SE, SEEB AREAMUSCAT ELECTRICITY DISTRIBUTION COMPANYLV & 11KV WORKS AT AL MABELLAH SOUTH, 34SE, SEEB AREA
76EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL MABELLAH SOUTH, PH-5, BLK-1, SEEB AREA.MUSCAT ELECTRICITY DISTRIBUTION COMPANYLV & 11KV WORKS AT AL MABELLAH SOUTH, PH-5, BLK-1, SEEB AREA.
77EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL MABELLAH SOUTH PH-7 SEEB AREA.MUSCAT ELECTRICITY DISTRIBUTION COMPANYLV & 11KV WORKS AT AL MABELLAH SOUTH PH-7 SEEB AREA.
78SHIFTING OF HIGH AND LOW VOLTAGE ELECTRICAL NETWORKS WHICH EFFECTING PROPERTIES IN BARKA AT SOUTH BATINAH GOVERNORATE FOR THE YEAR 2013MAZOON ELECTRICITY COMPANY SAOCCABLE LAYING AND SUBSTATON WORKS IN BARKA AT SOUTH BATINAH GOVERNORATE
79POWER SUPPLY TO STREET LIGHTS AT NEW DUQUM TOWN, FROM DUQUM TOWN – 02 S/S AT DUQUM WILAYAT – AL WUSTA GOVERNORATE.RURAL AREAS ELECTRICITY COMPANY SAOCSTREET LIGHTING POWER SUPPLY AT NEW DUQUM TOWN
80EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL MABELA SOUTH PH-7 AT SEEB AREA AT ZONE-3.MUSCAT ELECTRICITY DISTRIBUTION COMPANYCABLE LAYING AND SUBSTATION WORKS AT AL MABELA SOUTH PH-7 AT SEEB AREA AT ZONE-3
81EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT AL KHOUD PH 7 AT SEEB.MUSCAT ELECTRICITY DISTRIBUTION COMPANYCABLE LAYING AND SUBSTATION WORKS AT AL KHOUD PH 7 AT SEEB.
82EXTENSION OF ELECTRICAL DISTRIBUTION NETWORK AT MABELA SOUTH PH-4BLK-4 AT SEEB.MUSCAT ELECTRICITY DISTRIBUTION COMPANYLV & 11KV WORKS AT MABELA SOUTH PH-4BLK-4 AT SEEB
83LAYING OF 4CX240 SQMM CABLE WITH INST.OF 400A M.F.P. MABELAH SOUTH 24 NW SEEB AREAMUSCAT ELECTRICITY DISTRIBUTION COMPANYCABLE LAYING AND INST.OF 400A M.F.P. MABELAH SOUTH 24 NW SEEB AREA
84LAYING OF 4CX185SQ.MM CABLE WITH 400A MFP AT M.AL-NAHDHA PH.5/1 IN AL-AMERAT AREAMUSCAT ELECTRICITY DISTRIBUTION COMPANYLAYING OF 4CX185SQ.MM CABLE WITH 400A MFP AT M.AL-NAHDHA PH.5/1 IN AL-AMERAT AREA
8533KV O/H LINE MODIFICATION IN JAALAN B.B ALI AT SOUTH SHARQIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCO/H LINE MODIFICATION IN JAALAN B.B ALI AT SOUTH SHARQIYAH GOVERNORATE
86EXTENSION OF POWER SUPPLY TO THE BATINAH HOUSING UNITS IN BATINAH COATAL ROAD AT BADA’A AL SHARQEYA, HARA AL QADIMA & BATHA ALSHIL AT SUWAIQ IN NORTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCCABLE LAYING WORKS AT THE BATINAH HOUSING UNITS IN BATINAH COATAL ROAD AT BADA’A AL SHARQEYA, HARA AL QADIMA & BATHA ALSHIL AT SUWAIQ IN NORTH BATINAH GOVERNORATE
87ELECTRICAL DISTRIBUTION WORKS (433V & 11KV NETWORKS EXTENSION) FOR POWER SUPPLY TO THE SCATTERED PREMISES IN WILAYAT BIDBIDMAZOON ELECTRICITY COMPANY SAOCCABLE LAYING WORKS TO THE SCATTERED PREMISES IN WILAYAT BIDBID
88REHABILITATION WORKS OF LT LINES AT MUSSANA IN SOUTH BATINAH GOVERNORATE FOR THE YEAR 2012MAZOON ELECTRICITY COMPANY SAOCLT OH CABLE LAYING AT MUSSANA IN SOUTH BATINAH GOVERNORATE FOR THE YEAR 2012
89REINFORCEMENT WORKS IN EXISTING HV & LV ELECTRICAL DISTRIBUTION NETWORK AT WILAYAT HAIMA IN AL WUSTA GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCREINFORCEMENT WORKS IN EXISTING HV & LV ELECTRICAL DISTRIBUTION NETWORK AT WILAYAT HAIMA IN AL WUSTA GOVERNORATE
90DESIGN AND EXECUTE THE INSTALLATION OF ELECTRICAL NETWORK AT FISHERY HARBOUR – SUWAIQMINISTRY OF AGRICULTURE & FISHERIES WEALTHDESIGN AND EXECUTE THE INSTALLATION OF ELECTRICAL NETWORK AT FISHERY HARBOUR – SUWAIQ
91CONVERSION OF ALL OH AND DANGEROUS SERVICES CONNECTIONS AND ITS ASSOCIATED LV LINE AS PER SAFETY REQUIREMENTS AT AL KHUWAIMA VILLAGE IN WILAYAT JALAN BANI BU ALI SHARQIYAH SOUTH GOVERNORATERURAL AREAS ELECTRICITY COMPANY SAOCLV CABLE LAYING AS PER SAFETY REQUIREMENTS AT AL KHUWAIMA VILLAGE IN WILAYAT JALAN BANI BU ALI SHARQIYAH SOUTH GOVERNORATE
92REINFORCEMENT WORKS OF 11KV & 433V AT BARKA & RUMAIZ IN SOUTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCREINFORCEMENT WORKS OF 11KV & 433V AT BARKA & RUMAIZ IN SOUTH BATINAH GOVERNORATE
93ADDITIONAL 33KV REINFORCEMENT WORKS IN BARKA AT SOUTH BATINAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCCABLE LAYING WORKS FOR 33KV AND 11KV IN BARKA AT SOUTH BATINAH GOVERNORATE
94EXTENSION OF POWER SUPPLY TO HOUSING UNITS HOSPITAL HEIGHTS (SOUTH) AT SUR IN SOUTH SHARQIYAH GOVERNORATEMAZOON ELECTRICITY COMPANY SAOCLV AND 11KV WORKS FOR HOUSING UNITS HOSPITAL HEIGHTS (SOUTH) AT SUR IN SOUTH SHARQIYAH GOVERNORATE